تفاصيل المشروع

Madina Upgrade Project - Fire Alarm System

Fire Alarm System Installation – Madina Haram Upgrade Project (Closed)

As part of the Madina Haram Upgrade Project, we completed the installation of the fire alarm system infrastructure, including UL-listed conduits, fire-rated cabling, and insulation resistance (Megger) testing. All works were carried out in line with international standards (NFPA, BS5839) and approved shop drawings.

Cabling was routed through surface and concealed conduits with proper labeling and terminations at all devices. Megger testing was conducted to verify insulation integrity, ensuring safety and system reliability prior to commissioning. The project was delivered in close coordination with system owner.

.